A fire, a bad deploy, or a ransomware hit can erase a business that wasn't ready. We design, build, and test disaster recovery โ backups, multi-region replication, automated failover, recovery playbooks โ so a catastrophe becomes a blip, not a closure.
Region down โ traffic reroutes, automatically
primary
us-east โ
down
standby
us-west โ
serving
RTO
18 min
RPO
5 min
Recovery time (RTO)
Recovery point (RPO)
DR simulation pass rate
Game-day re-tests
Why plan for the worst
Disasters are rare but not optional. The difference between a blip and a closure is whether the recovery was designed and tested in advance.
Automated, validated backups with restore drills โ because an untested backup is just a hope. We confirm the data comes back, not just that it's stored.
Continuous replication keeps a standby region within seconds of production, so failover loses minutes of data, not days.
DNS failover reroutes traffic to a healthy standby the moment the primary goes down โ recovery measured in minutes, not a frantic all-hands.
We run game-day simulations that actually execute the plan, so your runbooks are proven and your team is practiced before the real thing.
What you walk away with
A DR plan in a document is a liability. You get the built infrastructure plus the proof it recovers within your targets.
From impact analysis to handover
We rank what must come back first and set RTO/RPO targets from the cost of downtime and data loss โ the plan starts from your business, not a template.
Backups, replication, and the standby environment are built to hit the agreed targets, with restore drills proving the data returns.
Failover and DNS routing are automated so recovery doesn't depend on one engineer remembering the steps at 3am.
A controlled game-day executes the full plan, validates RTO/RPO, and you receive runbooks plus a re-test schedule.
Recovery, proven
A credit union's 'DR plan' was a folder of restore notes nobody had ever run. An auditor flagged it. We designed, built, and game-day-tested real cross-region failover.
Greenfield Credit Union
Financial services ยท USA
RTO (was ~3 days)
RPO (was ~24 hrs)
Game-day pass rate
Audit findings remaining
โOur disaster plan was a document nobody had ever executed โ the auditor was right to flag it. pyronix built real cross-region failover and proved it in a game-day: three days of theoretical recovery became eighteen tested minutes.โ
Straight answers
Disaster recovery planning is designing, building, and testing the systems and procedures that restore your applications and data after a major failure โ a region outage, a bad deploy, ransomware, or hardware loss. It defines how fast you recover (RTO) and how much data you can afford to lose (RPO), then engineers the backups, replication, and failover to hit those targets.
RTO (Recovery Time Objective) is the maximum acceptable downtime before service is restored. RPO (Recovery Point Objective) is the maximum acceptable amount of data loss, measured in time โ for example, recovering to the last five minutes. We set both with you based on business impact, then design the architecture to meet them.
We run controlled, off-hours simulations that actually execute the failover โ redirecting traffic to a standby region or restored databases โ and verify the system comes up correctly within the agreed RTO and RPO. An untested DR plan is a guess; we prove it works before you ever need it, and re-test on a schedule.
Yes. We build active-passive and active-active architectures across separate cloud regions, or cloud-to-on-premises, using DNS failover and continuous database replication. When the primary goes down, traffic reroutes to a healthy standby automatically, so an outage becomes minutes of degradation rather than days offline.
At least quarterly, and after any significant architecture change. Infrastructure drifts, dependencies change, and a plan that worked last year can silently break. Regular game-day simulations keep the runbooks accurate and the team practiced, so recovery is routine rather than improvised under pressure.
Tell us what can't go down and for how long. We'll set your RTO and RPO, build the failover to hit them, and prove it in a game-day before you ever need it.
2000+ vetted engineers ยท 3 global hubs ยท 98% client retention
for project discussion
Once you fill out this form, our sales representatives will contact you within 24 hours.
We guarantee to get back to you within a business day.